Monday, October 22, 2012

The Repair Process for Christchurch Homeowners

By Jim Tanker


Since the earthquakes ravaged Christchurch city and encircling areas folks that live there have met the inescapable challenge associated with repairing their lives in addition to their area. First on the priority list of what to get done is certainly the repair of individuals private houses, it is anticipated to take many years before all the repairs have been completely completed.

There's been quite a lot of negative publicity with just how the procedure is currently currently being dealt with with reports of hardly any correspondence with homeowners in addition to bad quality with the work that is actually performed. It really is fortuitous there is an alternate procedure that allows property owners to enjoy greater control of the actual timings and quality of the maintenance on their houses. The procedure is referred to as opting out.

The first thing to do in the opting out procedure is to get your property assessed through the Earthquake Commission, commonly referred to as the EQC. The EQC is a government division which had been designed to guard house owners that secured themselves from devastation coming from earthquakes and other natural disasters (at first war damage had also been incorporated however, this ended up being taken out). This step is going to be undertaken whether or not you will be opting out.

Once your residence has been considered and the valuation on the restoration has been determined to be greater than $15k (this use to be $10k but recently been elevated) but below $100k, EQC immediately assigns your repair to Fletcher Building for project management (Fletchers Construction gained the government tendered contract for the project). Fletchers don't complete the job themselves but function as the project managers and will appoint contractors to the job. As you can recognise, that with the huge volume of work these assessments have created, it is not easy for Fletchers to manage the quality of the builders on every job. Should you be wanting to make sure your property earthquake repairs are finished to the highest of standards then EQC opt out may be the preferred option for you.

Opting out is the process through which you decide on your project manager/contractor, and thus having greater control over the quality of the project as well as the pace which the work is executed. Contractors assigned to work with Fletchers aren't allowed to work with other EQC jobs, basically, they're unable to work with opt out projects. If you're utilising an opt out builder, you can rest assured they are entirely devoted to your job.




About the Author:



No comments:

Post a Comment